
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|

| 标题 |
| 上海铁路局1~8月份超偏载检测装置运用及检修情况分析(1)(35 卷) |
| 英文标题 |
| Analysis on the Utilization and Maintenance of Overloading and Unbalanced Loading Detecting Devices During January to August in Shanghai Railway Administration (Part 1) |
| 摘要 |
| 上海铁路局共有超偏载检测装置18台,分布在4个编组站。文章介绍了2007年1~8月份超偏载数据分析运用、故障发生基本情况、各站检测点故障情况、远程诊断故障处理情况和设备故障检修情况。 |
| 作者 |
| 新闻作者:吴红龙,陈国贤,胡 辉,朱文轩 |
| 关键字 |