
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|

| 标题 |
| 铁路站段计量器具配备与工艺检测管理(35 卷) |
| 英文标题 |
| The Allocation and Technical Inspection Management of Measurement Instruments in Railway Stations and Depots |
| 摘要 |
| 全国铁路第六次大面积提速调图工作在全路顺利实施,开局良好,运输安全总体平衡。但在提速调图的交替和过渡期也了现了一些问题。对部分车辆、机务、工务、电务、供电单位在计量器具配备和工艺检测方面存在的问题,提出了与提速有关的重要工艺检测监控装备配备方案。 |
| 作者 |
| 新闻作者:李建华 |
| 关键字 |