| 对陇海线西宝段提速200 km/h工务主要工作的回顾(35 卷) |
| 英文标题 |
| Reviewing the Main Work in the field of Railway Permanent Way During the 200km/h Speeding-up on the Xi’an-Baoji Section of Longhai Railway |
| 摘要 |
| 对陇海线西宝段第六次提速调图中工务设备改造工作进行回顾,对施工组织措施进行归纳,并在新材料、新技术应用方面进行探索,提出了提速后设备日常养护的具体措施,认为要坚持安全与质量并重的原则,来提高动车组的运行保障。 |