
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|

| 标题 |
| 秀山隧道(出口)防涌水突砂施工配套技术(51 卷) |
| 英文标题 |
| Comprehensive construction technologies of preventing from gushing water and sand flow in entrance of Xiushan tunnel |
| 摘要 |
| 玉蒙铁路秀山隧道全长10 302 m,为全国知名I级高风险隧道。破碎白云岩段施工时极易发生涌水突砂。经过四年多的实践,摸索出“探地质”、“防突涌”、“绕险处”、“调工序”十二字施工应对经验,并取得显著成效。本文对破碎白云岩段防涌水突砂施工综合配套技术作一简要介绍。 |
| 作者 |
| 新闻作者:杨文国,王才高,付廷达 |
| 关键字 |