| 造桥机节段拼装56 m铁路双线箱梁施工技术(50 卷) |
| 英文标题 |
| Construction technology of 56-m-span double track railway box-girder in segmental assembling by bridge-erection crane |
| 摘要 |
| 太中银铁路阳石小东川大桥采用下行式造桥机节段拼装56 m铁路双线箱梁施工技术,解决了在深谷山岭复杂地形条件下,大跨简支箱梁的悬拼、整孔张拉及悬拼成桥线形控制等问题。通过对各主要工序的介绍,为类似工程提供了成熟的施工经验。 |