| 标题 |
| 加泥式土压平衡盾构开挖面稳定技术 (558 卷) |
| 英文标题 |
| Stabilizing Technology for Shield Excavating Cross-section Balanced with Mud Adding Earth Pressure |
| 摘要 |
| 土压平衡盾构施工的关键是控制开挖面的稳定,这是盾构施工控制沉降的核心。结合北京地铁10号线一期工程,分析土压平衡盾构开挖面的稳定机理,提出土压力设定值和泥土压力管理方法;针对泥土的功能和特性,提出泥土的塑性流动态控制和改良控制方法,并对出土量进行分析,得出 |
| 作者 |
| 新闻作者:李宏安 陆琰 |
| 关键字 |