
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|

| 标题 |
| 编组站综合自动化配置规模与作业能力匹配分析(557 卷) |
| 英文标题 |
| Analysis on the Matching between Scale of Integrated Automation and Operation Capacity in Marshalling Yard |
| 摘要 |
| 从铁路编组站的作业流程出发,对编组站各作业过程的能力确定方法进行理论分析,根据能力匹配关系提出编组站规模的配置原则和方法。总结编组站综合自动化对编组 站作业效率的提升体现,运用能力匹配原则对综合自动化编组站的配置规模进行分析和关键点评测,给出编组站综合 |
| 作者 |
| 新闻作者:张开治 |
| 关键字 |