
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|

| 标题 |
| 小间距双线盾构隧道临近高层楼房施工技术(553 卷) |
| 英文标题 |
| Engineering Technologies of Double-line Shield Tunnel with Small Distance between Track Centers Near High-rise Buildings |
| 摘要 |
| 北京地铁10号线三元桥站—亮马河站采用盾构法施工。施工前对双线隧道通过后的地面和楼房基础沉降与隧道内力变化进行计算和分析,提出隧道设置钢支撑、隧道间土体注浆加固的保护措施。针对右线盾构隧道施工,提出合理设置土压力、防止超挖、控制推进速度、加强同步注浆和二次 |
| 作者 |
| 新闻作者:李宏安 雷军 陆琰 |
| 关键字 |